Data Center Intelligence Platform

Know every data center before your competitors.

A vertical intelligence platform that tracks US data center construction, maps procurement timelines to your product catalog, and generates qualified leads — so your sales team is first to the table.

$104B
Trailing 12-Month US DC Spend
76+
Projects Starting in 6 Months
$2.3T
Global Pipeline (All Stages)

Overview

CT Intelligent Prospecting

A vertical intelligence platform that tracks US data center construction, maps procurement timelines to your product catalog, and generates qualified leads — so your sales team is first to the table.

$104B
US DC Spend
Trailing 12 months
76+
New Projects
Starting in 6 months
$2.3T
Global Pipeline
All stages

The Problem

Three Critical Gaps

Your sales team is flying blind.

Late Discovery

By the time your team finds a project in the news, the GC has already shortlisted suppliers. Utility interconnection requests — the earliest signal — happen 12-18 months before construction. Nobody is tracking them.

Scattered Intelligence

Project data lives in county permits, zoning filings, SEC reports, earnings calls, and trade press. No single source connects them. Your reps spend hours Googling instead of selling.

No Product-Project Mapping

Even when a project is found, nobody calculates: “A 200MW campus needs ~40 generators, 120 PDUs, and 800 tons of cooling.” The equipment gap between project data and your catalog stays unbridged.


The Solution

Four layers of intelligence.

01
Ingest

Data Acquisition

Scrape permits, utility filings, SEC reports, and trade press. Integrate paid APIs for comprehensive coverage across 2,000+ jurisdictions.

Shovels.aiConstructConnect RSS/ScrapeSEC EDGAR
02
Enrich

AI Processing

Claude API parses unstructured announcements into structured records: location, MW capacity, owner, GC, MEP subs, timeline, and project stage.

Claude SonnetClaude HaikuNLP Pipeline
03
Map

Product Matching

Estimate equipment BOMs by MW capacity. Map each project's needs to customer catalogs. Prioritize by timing, geography, and competitive landscape.

BOM EngineCatalog SyncScoring
04
Prospect

Sales Activation

Find decision-makers at GCs and MEP subs. Generate personalized outreach. Push qualified leads into Salesforce with full context attached.

Hunter.ioLinkedInSalesforce

Product Preview

Dashboard Overview

Real-time pipeline intelligence at a glance.

247
Active Projects
+23 this month
14.8 GW
Total Capacity
+2.1 GW added
1,842
Matched Products
+340 new matches
$88.2B
Pipeline Value
+$12.4B this quarter
VirginiaGeorgiaOhioTexasArizonaOregon
Pre-ConstructionConstructionPlanningPre-Planning

Recent Projects

Google Midlothian Campus

Pre-Con
Midlothian, TX | 400 MW | GC: Turner
GeneratorsSwitchgearCoolingUPS

Microsoft Boydton Expansion

Active
Boydton, VA | 250 MW | GC: DPR
TransformersCable TraysFire Suppression

Stargate — Abilene Phase 1

Planning
Abilene, TX | 1.2 GW | GC: Mortenson
Structural SteelHVACPDU/RacksGenerators

Meta DeKalb County DC

Pre-Con
DeKalb, GA | 180 MW | GC: Whiting-Turner
CoolingSwitchgear

Project Detail

Google Midlothian Campus

Deep-dive into a single project with contacts, equipment matching, and AI-generated briefs.

Capacity
400 MW
Est. Cost
$2.8B
General Contractor
Turner
Location
Midlothian, TX
Owner: Alphabet Inc. / Google Cloud
Stage: Pre-Construction

Project Timeline

Permit Filed (Mar 2025)NowCommissioning (Q4 2027)

Key Contacts

RM
Rachel Martinez
VP ProcurementTurner Construction
JK
James Kim
Sr. Project ManagerGoogle DC Ops
SL
Sarah Lee
MEP LeadComfort Systems USA

Equipment Match

92% catalog match
EquipmentQtyEst. Value
Backup Generators (2MW)x40 units$18.4M
Medium-Voltage Switchgearx24 units$7.2M
Precision Cooling Unitsx160 units$12.8M
UPS Systems (500kVA)x32 units$4.1M
Power Distribution Unitsx480 units$3.6M
Total Opportunity: $46.1M

AI Prospect Brief

Google's Midlothian campus is their 3rd Texas facility, driven by AI compute demand for Gemini training clusters. Turner is the GC, with Comfort Systems USA handling MEP. Procurement window for electrical equipment opens Q2 2026 — 14 weeks out. Turner has historically sourced switchgear from Eaton and Schneider; a competitive bid with 8-week lead time could displace. Recommend targeting Rachel Martinez (VP Procurement) with a site-specific proposal referencing your work on the Mayes County, OK Google campus.


Market Context

Industry Landscape

A $104B opportunity accelerating.

Top General Contractors — Active DC Projects

General ContractorActive Projects
Turner18
Whiting-Turner15
DPR12
McCarthy10
Mortenson9
Michels7

US Concentration by Region

Southeast US56%
Midwest US27%
Northeast US15%
West US2%

Key Drivers: Google, Microsoft, Amazon, Meta, and Oracle/OpenAI (Stargate) are all expanding US data center footprints to support AI workloads.


Why CT Intelligent Prospecting

Competitive Advantages

Earliest Signal Capture

Utility interconnection requests surface 12-18 months before construction starts. We monitor public utility commission filings — the earliest possible indicator — so your team engages before competitors even know a project exists.

Product-to-Project Intelligence

No other platform maps “200MW campus” to “40 generators + 120 PDUs + 800 tons cooling” and then matches those needs against your specific catalog. This is the bridge between construction intelligence and manufacturing sales.

AI-Native from Day 1

Claude API handles unstructured-to-structured conversion, BOM estimation, prospect briefs, and personalized outreach — no regex, no manual tagging. The intelligence layer improves with every project processed.


Technology

Technology Stack

Modern, scalable architecture built for data-intensive intelligence.

P
Python / FastAPI
Backend & ingestion pipelines
R
React
Dashboard with map & filters
P
PostgreSQL
Structured project data
E
Elasticsearch
Full-text search & filtering
C
Claude API
NLP enrichment & generation
A
AWS / GCP
Hosting & infrastructure
S
Salesforce
CRM sync & lead push
S
Snowflake
Analytics & data warehouse

Implementation

Roadmap

Phase 1MVPWeeks 1-4
  • Python scraper for DC news feeds (Construction Dive, DCK)
  • Claude pipeline: announcements → structured JSON
  • PostgreSQL schema with core project model
  • React dashboard: map + table + basic filters
  • Manual product mapping for 1-2 pilot customers
Phase 2Data ExpansionWeeks 5-8
  • Integrate Shovels.ai / ConstructConnect API
  • Contact enrichment via PDL / Hunter.io
  • Automated project stage classification
  • Equipment BOM estimation by MW capacity
  • Email alerts for customer-matched projects
Phase 3Intelligence & ScaleWeeks 9-16
  • AI-generated prospect briefs per project
  • Outreach sequence builder with personalization
  • Salesforce integration for qualified lead push
  • Analytics: pipeline value, win rates, coverage gaps
  • Multi-customer support & catalog management

Get Started

Let's build CT
Intelligent Prospecting.

The data center boom isn't slowing down. The question is whether our customers find these projects first — or their competitors do.

CT Intelligent Prospecting — Data Center Intelligence | Customertimes